PlotSet LogoPlotSet

How to Create a Gauge Chart

A step by step walkthrough for building a grid of speedometer style gauges with targets, colour bands and a needle in PlotSet.

About 6 minutes

You will end up with a grid of gauges, one per row of your data, each with its value in the middle and an optional target marker.

Expect about six minutes. Most of it goes on choosing the scale and the colour bands.

The data you need

One row per gauge, with a value and, if you want them, a metric name and a target.

Sample CSV
MetricValueTarget
Customer Satisfaction8290
On-Time Delivery7685
Server Uptime9999
NPS Score4560
Notes

Values must be plain numbers, with no percent signs.

The minimum and maximum are settings, not data, so every gauge shares one scale.

Up to 24 gauges are drawn. After that a note says how many are not shown.

The metric and target columns are optional.

The steps

The exact click path in PlotSet, from a blank template to a finished chart.

  1. 01

    Open the Gauge template

    From the PlotSet dashboard, start a new project and choose Gauge Chart from the Other category. It loads with a sample of eight KPIs.

    PlotSet's template picker: chart categories listed down the left, the Bar Charts grid open, and the Bar Chart template card showing its Select button.
    Every guide starts here. Pick the category, then the template: it is the same grid whichever chart type you are after.
  2. 02

    Add your values

    Import a CSV or .xlsx file, paste rows from a spreadsheet, or connect a Google Sheet. Each row becomes one gauge.

    The PlotSet editor's data view: a spreadsheet grid with Name, Value and Region columns filled with Canadian province figures, beside the Data panel offering CSV upload, Magic Import and Google Sheet sync.
    The data view, shown here on a bar chart project. Upload a CSV, lift the numbers out of an image with Magic Import, or sync a Google Sheet. The panel is identical for every chart type.
  3. 03

    Check the column bindings

    Bind the value column, then the metric name as the label and the target if you have one.

    The PlotSet data panel with the column bindings highlighted: Label/time mapped to column A, Values to column B and Filter/color to column C, with the Auto Binding button below.
    Bindings decide which column becomes the label, which supplies the values and which drives the colour. Auto Binding guesses them from your headers, so check it rather than assume it.
  4. 04

    Set the scale

    In the Scale tab, set the minimum and maximum. A percentage metric usually runs from 0 to 100.

    The PlotSet editor on the Preview tab: a finished Gauge Chart on the canvas, with the settings panel outlined in red down the right-hand side.
    The Preview tab for a Gauge Chart. Every styling control lives in the outlined panel, each on its own tab: appearance, header, footer and the options specific to this chart type.
  5. 05

    Add colour bands

    In the Bands tab, set two thresholds and a colour for each of the poor, fair and good ranges.

  6. 06

    Switch on the needle

    The Needle tab adds a pointer at the value, and sets its colour and width.

  7. 07

    Shape the arc

    The Arc tab sets the start and end angle and the thickness, and whether the ends are rounded.

  8. 08

    Publish and embed

    Publish for a live chart and copy the embed code from the Share dialog. Check how it looks at the width of your page before you share it.

    The PlotSet editor toolbar with the Share button highlighted, sitting next to the Export button.
    Share is how a finished chart becomes a public link and an embed code.

Start from the Gauge Chart template with sample data already loaded, then swap in your own.

Open the template

Publish, embed or export it

The last stretch is the same for every chart type: Share turns the chart into a live public link and an embed code, Export writes it out as a static file.

Share: public link and embed code

Activating the embed code and public link publishes the chart. The link is safe to send to anyone, and the embed code drops into any page as an iframe that keeps the hover tooltips and the interactivity. Edit the chart later and hit Recreate to push those changes out to both.

The PlotSet editor toolbar with the Share button highlighted, sitting next to the Export button.
Share is how a finished chart becomes a public link and an embed code.
PlotSet's Share dialog: the toggle activating the embed code and public link, buttons for Link, Embed, Facebook, Reddit, Twitter, LinkedIn and Email, and the public chart link with a Copy button.
Switch on the embed code and public link, then copy the link or take the iframe. Recreate pushes later edits out to everyone already holding it.

Export: SVG, PNG or JPG

Export writes a static copy at whatever size you need. SVG stays sharp at any scale and can still be edited in a design tool; PNG and JPG are the safe choices for slides and documents. The scale multiplier is what gets you a crisp image on a retina screen.

The PlotSet editor toolbar with the Export button highlighted.
Export is the route to a static file for a slide or a report.
PlotSet's Export chart dialog: a 2x scale selector, width and height fields set to 1000 by 600, and the open format menu listing SVG, PNG and JPG.
SVG stays sharp at any size and stays editable in a design tool; PNG and JPG are the safe picks for a deck. Set the scale before you export so the image is crisp on a retina screen.

Styling tips for a Gauge Chart

Keep the grid small

Eight gauges or fewer stay readable. Beyond that, a bullet chart fits more.

Use bands sparingly

Three colours is enough. More makes the dial hard to read.

Shorten the labels

Short metric names stay whole under each gauge.

Share one unit

Put percentages on one board and counts on another.

Common mistakes when making a Gauge Chart

The arcs look almost empty

The maximum is far above the values. Lower it so the scale fits the data.

A value is off the scale

It is above the maximum or below the minimum, so the arc is clipped. Widen the range.

There is no target marker

The target column is not bound. Check the bindings.

Some gauges are missing

Only 24 gauges are drawn. Split the data across charts.

Learn more about the Gauge Chart

Not sure the Gauge Chart is the right choice? See what it is, when to use it and when not to.

About the Gauge Chart

Gauge Chart: common questions

Yes. With a single row the gauge fills the canvas.

Make your Gauge Chart now

Free to start with 300+ templates. No credit card required.